Abstract
In the majority of the previous research on Kanban systems delivery lead time is treated as a fixed value. In many practical situations, however, the lead time is variable. In this paper, optimal operation planning of a fixed interval withdrawal Kanban with variable lead times is proposed. A cost is incurred for inventory level less than the safety inventory level, since the risk of shortage of inventory must be considered. Behaviour of the optimal number of Kanbans and the withdrawal interval of Kanbans are investigated in terms of various parameters such as standard deviation and mean lead time.
Original language | English |
---|---|
Pages (from-to) | 21-29 |
Number of pages | 9 |
Journal | Production Planning and Control |
Volume | 5 |
Issue number | 1 |
DOIs | |
Publication status | Published - Jan 1 1994 |
Keywords
- Kanban system
- Optimal operation planning
- Shortage inventory cost
- Total operation cost
- Variable lead times
ASJC Scopus subject areas
- Computer Science Applications
- Strategy and Management
- Management Science and Operations Research
- Industrial and Manufacturing Engineering