Sequencing method for products in consideration of assembly time

Kenji Kurashige, Yoshinari Yanagawa, Shigeji Miyazaki, Yoshimasa Kameyama

Research output: Contribution to journalArticle

6 Citations (Scopus)

Abstract

In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.

Original languageEnglish
Pages (from-to)565-573
Number of pages9
JournalInternational Journal of Production Economics
Volume60
DOIs
Publication statusPublished - Apr 20 1999

    Fingerprint

ASJC Scopus subject areas

  • Economics and Econometrics
  • Industrial and Manufacturing Engineering

Cite this