Sequencing method for products in consideration of assembly time

Kenji Kurashige, Yoshinari Yanagawa, Shigeji Miyazaki, Yoshimasa Kameyama

Research output: Contribution to journalArticle

6 Citations (Scopus)

Abstract

In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.

Original languageEnglish
Pages (from-to)565-573
Number of pages9
JournalInternational Journal of Production Economics
Volume60
DOIs
Publication statusPublished - Apr 20 1999

Fingerprint

Heuristic methods
Scheduling
Experiments
Sequencing
Objective function
Numerical experiment
Mixed model
Heuristics

ASJC Scopus subject areas

  • Economics and Econometrics
  • Industrial and Manufacturing Engineering

Cite this

Sequencing method for products in consideration of assembly time. / Kurashige, Kenji; Yanagawa, Yoshinari; Miyazaki, Shigeji; Kameyama, Yoshimasa.

In: International Journal of Production Economics, Vol. 60, 20.04.1999, p. 565-573.

Research output: Contribution to journalArticle

Kurashige, Kenji ; Yanagawa, Yoshinari ; Miyazaki, Shigeji ; Kameyama, Yoshimasa. / Sequencing method for products in consideration of assembly time. In: International Journal of Production Economics. 1999 ; Vol. 60. pp. 565-573.
@article{91be2d7568f640b0be456fbeb2289c26,
title = "Sequencing method for products in consideration of assembly time",
abstract = "In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.",
author = "Kenji Kurashige and Yoshinari Yanagawa and Shigeji Miyazaki and Yoshimasa Kameyama",
year = "1999",
month = "4",
day = "20",
doi = "10.1016/S0925-5273(98)00174-1",
language = "English",
volume = "60",
pages = "565--573",
journal = "International Journal of Production Economics",
issn = "0925-5273",
publisher = "Elsevier",

}

TY - JOUR

T1 - Sequencing method for products in consideration of assembly time

AU - Kurashige, Kenji

AU - Yanagawa, Yoshinari

AU - Miyazaki, Shigeji

AU - Kameyama, Yoshimasa

PY - 1999/4/20

Y1 - 1999/4/20

N2 - In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.

AB - In mixed-model assembly scheduling with a single workstation, there is a new sequencing method [time-based goal chasing method (TBGC)] in consideration of the different assembly times between jobs. In this paper, we propose a new objective function in expanding the TBGC. Furthermore, we propose some heuristic methods to minimize the objective function. And through numerical experiments, we show the effectiveness of our proposal.

UR - http://www.scopus.com/inward/record.url?scp=0032647694&partnerID=8YFLogxK

UR - http://www.scopus.com/inward/citedby.url?scp=0032647694&partnerID=8YFLogxK

U2 - 10.1016/S0925-5273(98)00174-1

DO - 10.1016/S0925-5273(98)00174-1

M3 - Article

VL - 60

SP - 565

EP - 573

JO - International Journal of Production Economics

JF - International Journal of Production Economics

SN - 0925-5273

ER -