TY - GEN
T1 - Risk analysis of a subway tunnel shield based on a fuzzy synthetic approach
AU - Jie, Wang
AU - Guo, Liang Jie
AU - Li, Yan Qing
PY - 2011/7/7
Y1 - 2011/7/7
N2 - In this paper, an overall analysis was carried out of the factors influencing the safety system of the subway running tunnel, taking the case of Wuhan subway project, and a hierarchy structure model is established. On the basis of the comprehensive evaluating risk of fuzzy synthetic judging model, maximum degree of membership principle and R=PC, this paper has determined the risk rank of the tunnel shield construction interval.
AB - In this paper, an overall analysis was carried out of the factors influencing the safety system of the subway running tunnel, taking the case of Wuhan subway project, and a hierarchy structure model is established. On the basis of the comprehensive evaluating risk of fuzzy synthetic judging model, maximum degree of membership principle and R=PC, this paper has determined the risk rank of the tunnel shield construction interval.
KW - fuzzy synthetic approach
KW - risk
KW - subway
KW - tunnel shield
UR - http://www.scopus.com/inward/record.url?scp=79959879244&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=79959879244&partnerID=8YFLogxK
U2 - 10.1109/ICEICE.2011.5777383
DO - 10.1109/ICEICE.2011.5777383
M3 - Conference contribution
AN - SCOPUS:79959879244
SN - 9781424480395
T3 - 2011 International Conference on Electric Information and Control Engineering, ICEICE 2011 - Proceedings
SP - 4438
EP - 4441
BT - 2011 International Conference on Electric Information and Control Engineering, ICEICE 2011 - Proceedings
T2 - 2011 International Conference on Electric Information and Control Engineering, ICEICE 2011
Y2 - 15 April 2011 through 17 April 2011
ER -