Induction synchrotron (3): Rapid cycle synchrotron and slow cycle synchrotron (hardware components for the upgrade of KEK 12 GEV-PS)

K. Takayama, Y. Arakida, K. Egawa, S. Igarashi, J. Kishiro, E. Nakamura, M. Sakuda, M. Shirakata, T. Toyama, M. Uota

Research output: Contribution to conferencePaper

Abstract

A technique of super-bunch acceleration with high repetition induction accelerators and an accumulator ring (AR) are required for the upgrade of the 12 GeV proton synchrotron at KEK. A fast dynamic switching of 3 kV flip-flop pulses was performed at 200 kHz with SI-thyristors, to confirm a barrier bucket scheme for induction acceleration finally. On the other hand, a model permanent gradient magnet for the AR was assembled to investigate its field quality, a temperature dependence and its compensation.

Original languageEnglish
Pages3287-3289
Number of pages3
Publication statusPublished - Dec 1 2001
Event2001 Particle Accelerator Conference - Chicago, IL, United States
Duration: Jun 18 2001Jun 22 2001

Other

Other2001 Particle Accelerator Conference
CountryUnited States
CityChicago, IL
Period6/18/016/22/01

ASJC Scopus subject areas

  • Engineering(all)

Fingerprint Dive into the research topics of 'Induction synchrotron (3): Rapid cycle synchrotron and slow cycle synchrotron (hardware components for the upgrade of KEK 12 GEV-PS)'. Together they form a unique fingerprint.

  • Cite this

    Takayama, K., Arakida, Y., Egawa, K., Igarashi, S., Kishiro, J., Nakamura, E., Sakuda, M., Shirakata, M., Toyama, T., & Uota, M. (2001). Induction synchrotron (3): Rapid cycle synchrotron and slow cycle synchrotron (hardware components for the upgrade of KEK 12 GEV-PS). 3287-3289. Paper presented at 2001 Particle Accelerator Conference, Chicago, IL, United States.