An inventory control scheme for simultaneous production planning and scheduling under demand uncertainty

T. Nishi, H. Tominaga, M. Konishi

Research output: Contribution to journalArticle

Abstract

We propose an inventory control scheme for simultaneous production planning and scheduling for uncertain demand situations. The stochastic approach accompanied with feedback information from the results of production scheduling is used to determine appropriate inventory amount to maximize the total profit. Numerical results show the effectiveness of the proposed approach.

Original languageEnglish
Pages (from-to)2099-2104
Number of pages6
JournalComputer Aided Chemical Engineering
Volume21
Issue numberC
DOIs
Publication statusPublished - 2006

ASJC Scopus subject areas

  • Chemical Engineering(all)
  • Computer Science Applications

Fingerprint Dive into the research topics of 'An inventory control scheme for simultaneous production planning and scheduling under demand uncertainty'. Together they form a unique fingerprint.

  • Cite this