• 316 Citations
  • 9 h-Index
1984 …2018
If you made any changes in Pure these will be visible here soon.

Fingerprint Fingerprint is based on mining the text of the person's scientific documents to create an index of weighted terms, which defines the key subjects of each individual researcher.

Sampling Engineering & Materials Science
Inspection Engineering & Materials Science
Screening Engineering & Materials Science
Sales Engineering & Materials Science
Control Charts Mathematics
Supply chains Engineering & Materials Science
Normal distribution Engineering & Materials Science
Process monitoring Engineering & Materials Science

Network Recent external collaboration on country level. Dive into details by clicking on the dots.

Research Output 1984 2018

  • 316 Citations
  • 9 h-Index
  • 199 Article
  • 9 Conference contribution
1 Citations

Information visualization about changes of process mean and variance on (¯x, s) control chart

Takemoto, Y. & Arizono, I., Apr 27 2018, (Accepted/In press) In : Quality Technology and Quantitative Management. p. 1-15 15 p.

Research output: Contribution to journalArticle

Visualization
Drawing (graphics)
Control charts
Process mean
Information visualization

Can the agent with limited information solve travelling salesman problem?

Sakiyama, T. & Arizono, I., 2017, In : Complexity. 2017, 9562125.

Research output: Contribution to journalArticle

heuristics
cost
travel
method

Reconsideration of a negotiation procedure for buyback contract

Tsurui, S., Takemoto, Y., Arizono, I., Tomohiro, R. & Suehiro, T., 2017, In : Journal of Japan Industrial Management Association. 67, 4, p. 314-317 4 p.

Research output: Contribution to journalArticle

Bargaining
Supply Chain
Supply chains
Buy-back contract
Incentives

Rectifying inspection for PAOSQLL scheme based on variable repetitive group sampling plan

Arizono, I., Okada, Y., Tomohiro, R. & Takemoto, Y., Aug 8 2017, (Accepted/In press) In : International Journal of Advanced Manufacturing Technology. p. 1-10 10 p.

Research output: Contribution to journalArticle

Inspection
Sampling

Variance evaluation of time to failure in two-component standby redundancy system with priority under limited information

Arizono, I., Olgawa, S., Tomohiro, R. & Takemoto, Y., 2017, In : Journal of Japan Industrial Management Association. 68, 2, p. 120-123 4 p.

Research output: Contribution to journalArticle

Redundancy
Repair
Evaluation Method
Evaluation
Numerical Verification